November 20, 2026 USD 44.93EUR 49.28PLN 11.06
Новини Вараш — коротко й по суті
LIVE
Heating system upgraded at kindergarten in Sarny Emergency services in Rivne region conduct response drills for potential attacks USA releases new declassified files on unidentified anomalous phenomena Isolating Crimea: Experts Evaluate the Effectiveness of Strikes on Occupier Logistics Poland Urges NATO Allies to Strengthen Air Defense After Missile Incursions Poland urges NATO to strengthen eastern flank defenses following missile incidents How to fix choppy video on your TV: a simple hidden setting UNICEF Reports Over 1,144 Children Killed or Injured in Ukraine in First Ten Months Ukrainian economy shrinks for third consecutive month due to impact of hostile strikes Strikes on the Crimean Bridge as a Tool of Diplomatic Pressure: Expert Assessment Heating system upgraded at kindergarten in Sarny Emergency services in Rivne region conduct response drills for potential attacks USA releases new declassified files on unidentified anomalous phenomena Isolating Crimea: Experts Evaluate the Effectiveness of Strikes on Occupier Logistics Poland Urges NATO Allies to Strengthen Air Defense After Missile Incursions Poland urges NATO to strengthen eastern flank defenses following missile incidents How to fix choppy video on your TV: a simple hidden setting UNICEF Reports Over 1,144 Children Killed or Injured in Ukraine in First Ten Months Ukrainian economy shrinks for third consecutive month due to impact of hostile strikes Strikes on the Crimean Bridge as a Tool of Diplomatic Pressure: Expert Assessment

Heating system upgraded at kindergarten in Sarny

💼 Economy 1 min read 👁 0

The boiler room at the 'Veselka' preschool has been updated with a modern solid-fuel boiler to improve energy efficiency.

Heating system upgraded at kindergarten in Sarny💼Economy

Photo: polissia.news

Key points

  • 150 kW solid-fuel boiler installed
  • Chimney system replaced
  • Project funded by the local budget

In Sarny, works to upgrade the heating system at Kindergarten No. 8 'Veselka' have been completed. The project was funded by the local budget, marking a significant step toward improving the facility's infrastructure.

Technical upgrade details

The core of the modernization was the replacement of outdated equipment with a modern 150 kW KRONAS UNIC-NEW solid-fuel boiler. In addition to installing the new unit, specialists completely replaced the chimney system, which is essential for the safe and efficient operation of the boiler room.

The facility's administration expects the new equipment to optimize fuel consumption and ensure a stable temperature in the classrooms, even during severe winter frosts.

Source polissia.news — polissia.news/u-dytsadku-v-sarnah-vstanovyly-novyj-tverdopalyvnyj-kotel/ ↗

Contact the newsroom

Got a tip, a proposal or a partnership question? Write to us and we will reply shortly.